Asset Report

El Abra SxEw copper mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

El Abra is an SxEw leach operation which has been producing copper cathode since 1996. During Q1 2011 production from the newly commissioned ‘Sulfolix Project' commenced, marking the start of a transition from processing oxide to sulphide ore, thereby extending the life of the operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • CAPEX
  • Mining
    • Crush
    • Static Leach
    • Dynamic Leach (ceased 2011)
    • SxEw

Tables and charts

This report includes 2 images and tables including:

  • El Abra SxEw Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
  • Detailed map

What's included

This report contains:

  • Document

    El Abra SxEw copper mine

    XLS 432.50 KB

  • Document

    El Abra SxEw copper mine

    PDF 1.71 MB