Asset report

El Coronel gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Construction commenced in 2008 and first production was in 2009. Total pre-production capex was stated at $80M.

What's included

This report contains

  • Document

    El Coronel gold mine

    XLS 123.50 KB

  • Document

    El Coronel gold mine

    PDF 612.90 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898