El Mochito zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
Tables and charts
This report includes the following images and tables:
-
El Mochito Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalentDetailed map
What's included
This report contains:
Other reports you may be interested in
Colquijirca (El Brocal) copper mine
A detailed cost competitive analysis of the Colquijirca (El Brocal) copper mine.
$2,250Izok Lake zinc mine project
A detailed analysis of the Izok Lake zinc mine project.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250