Asset Report

El Soldado copper minesite

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The accompanying analysis considers production of copper in concentrate and copper cathode at El Soldado. Production from the El Soldado underground mine ceased in 2011 with all subsequent production from the El Cobre sulphide concentrator being sourced from open-pit mining. A major fault system exists that imposes material constraints on existing mine planning and which poses significant rock mechanics problems in exploiting the resource.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
    • Mill
    • Leach /SxEw

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    El Soldado copper minesite

    PDF 1.15 MB

  • Document

    El Soldado copper minesite

    XLS 428.00 KB