Asset report

El Soldado copper minesite

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The accompanying analysis considers production of copper in concentrate and copper cathode at El Soldado. Production from the El Soldado underground mine ceased in 2011 with all subsequent production from the El Cobre sulphide concentrator being sourced from open pit mining. A major fault system exists that imposes material constraints on existing mine planning and which poses significant rock mechanics problems in exploiting the resource.

What's included

This report contains

  • Document

    El Soldado copper minesite

    XLS 580.00 KB

  • Document

    El Soldado copper minesite

    PDF 546.02 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898