Capital expenditure of $25M was budgeted to bring the project into production. A comprehensive environmental management plan was adopted, complying with local and international standards. The plan includes continual rehabilitation and re-vegetation of the site. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.