The Flin Flon zinc smelter was commissioned in 1930 with a capacity of 20kt/a zinc to treat concentrates from the Flin Flon mine. By the 1980s capacity had reached 85kt/a based on roasting in wedge roasters followed by neutral and weak acid leaching. Leach residue was routed to the copper smelter for precious metals recovery to copper anode, and for zinc recovery by the fuming of reverbatory furnace slag. Sulphur dioxide from the roasting operation was vented to atmosphere. In 1989, the...
Table of contents
- Other
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Flin Flon Operations (Callinan) (Closed) zinc mine
A detailed analysis of the Flin Flon Operations (Callinan) zinc mine.
$2,250
Asset Report
Flin Flon Operations (Callinan) copper mine
A detailed analysis of the Flin Flon Operations (Callinan) copper mine.
$2,250
Asset Report
Flin Flon (closed) copper smelter
A detailed analysis of the Flin Flon copper smelter.
$2,250