Asset Report

Flin Flon zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Flin Flon zinc smelter was commissioned in 1930 with a capacity of 20kt/a zinc to treat concentrates from the Flin Flon mine. By the 1980s capacity had reached 85kt/a based on roasting in wedge roasters followed by neutral and weak acid leaching. Leach residue was routed to the copper smelter for precious metals recovery to copper anode, and for zinc recovery by the fuming of reverbatory furnace slag. Sulphur dioxide from the roasting operation was vented to atmosphere. In 1989, the...

Table of contents

  • Other

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Flin Flon zinc smelter

    PDF 1.20 MB

  • Document

    Flin Flon zinc smelter

    ZIP 1.14 MB