Asset Report

Golden Highway gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Golden Highway project was originally planned (2012 Preliminary Economic Assessment - PEA) as a combined open pit & underground mining operation. An updated PEA was published in October 2020 based on a standalone underground mining operation from the South West Deposit with an 11 year mine life. Ore is to be processed in a carbon in pulp (CIP) circuit to produce a dore on site. Based on results of an updated Preliminary Economic Assessment (PEA), average annual gold production is expected to peak at 86koz in year 5.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Golden Highway gold mine project

    XLS 115.00 KB

  • Document

    Golden Highway gold mine project

    PDF 1.21 MB

  • Document

    Golden Highway gold mine project

    ZIP 978.46 KB