Asset Report
Golden Highway gold mine project
Report summary
The Golden Highway project was originally planned (2012 Preliminary Economic Assessment - PEA) as a combined open pit & underground mining operation. An updated PEA was published in October 2020 based on a standalone underground mining operation from the South West Deposit with an 11 year mine life. Ore is to be processed in a carbon in pulp (CIP) circuit to produce a dore on site. Based on results of an updated Preliminary Economic Assessment (PEA), average annual gold production is expected to peak at 86koz in year 5.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- Power
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Greenstone (Hardrock) gold mine project
A detailed analysis of the Greenstone (Hardrock) gold mine project.
$2,250
Asset Report
Nezhda gold mine project
A detailed analysis of the Nezhda gold mine project.
$2,250
Asset Report
Bombore gold mine project
A detailed analysis of the Bombore gold mine project.
$2,250