Asset Report
Golden Kilometre (Closed) gold mine
Report summary
The Golden Kilometre is mined under a joint venture agreement that was entered-into in June 1986. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Lady Bountiful Extended (Closed) gold mine
A detailed analysis of the Lady Bountiful Extended (Closed) gold mine.
$2,250
Asset Report
Lady Bountiful (Closed) gold mine
A detailed analysis of the Lady Bountiful (Closed) gold mine.
$2,250
Asset Report
Ridgeway (Closed) gold mine
A detailed analysis of the Ridgeway (Closed) gold mine.
$2,250