Asset Report
Goliath gold mine project
Report summary
The Goliath Gold Project is located 20km east of the city of Dryden in northwestern Ontario. The 2018 Technical Report details the proposed mine life to extend 13 years with two years of pre-production development. The project is designed to utilize open pit and underground mining methods in an effort to maximize the gold profile. Surface mining will stretch for seven years of the mine life while underground mining will start in the second year of production and continue for 11 years until the end of the project. The project is designed to utilize open pit and underground mining methods in an effort to maximize the gold profile. In August 2020, Treasury Metals acquired 100% of the Goldlund project, which is located 35km by road from the Goliath property. The combined project is said to hold around 2 million ounces of gold that will be extracted over 12 years at an average of 100koz per annum.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Yellowknife gold mine project
A detailed analysis of the Yellowknife gold mine project.
$2,250
Asset Report
Cameron gold mine project
A detailed analysis of the Cameron gold mine project.
$2,250