Asset Report
Golpu gold mine project
Report summary
Golpu is a feasibility stage, porphyry copper-gold project in the Morobe Province of Papua New Guinea. The accompanying analysis is based on the scope outlined in the 2018 Feasibility Study, which outlines a 28 year mine life, during which production will be from a succession of three block caves. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Port
- Power
- Pipeline
- CAPEX
- OPEX
- Mining
- Processing
- Royalty
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250