Asset report

Haquira copper minesite project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Haquira project is located adjacent to Xstrata’s Las Bambas Project which started construction in 2011. The accompanying analysis assumes a combination of conventional SxEw and concentrator operations as outlined in a 2010 PEA. In its 2012 Annual Information Form, First Quantum expected first production in 2019. Given First Quantum's project pipeline (Cobre Panama, Sentinel, and others) Wood Mackenzie takes a more conservative view and sets a target start for 2020.

What's included

This report contains

  • Document

    Haquira copper minesite project

    XLS 548.00 KB

  • Document

    Haquira copper minesite project

    PDF 513.58 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898