Asset report

Hellyer Mine Restart (Closed) zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

This profile relates to Bass Metals' Hellyer Mine Project (HMP) a restart of the Hellyer Zn Pb mine that closed in 2000. The HMP sources ore from the Fossey deposit for processing at the Hellyer mill. The planned mill rate of 400kt/a was reduced to 350kt/a in an updated mine plan in 2011 subsequent to the discovery of widespread low grade barite altered ore across the Fossey deposit. The mine and mill was placed on care and maintenance in mid 2012.

What's included

This report contains

  • Document

    Hellyer Mine Restart zinc mine

    XLS 488.00 KB

  • Document

    Hellyer Mine Restart zinc mine

    PDF 459.95 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Costs
  • Geology
  • Reserves and resources
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • HMP Resources (as at 30 June 2013)
  • HMP Reserves (as at 30 June 2012 - prior to closure)

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898