Asset Report

Hemlo gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The property comprises the Williams open-pit and underground mine, Golden Giant and the David Bell underground mines, all located within the Hemlo gold camp. All three mines work different parts of the same ore-body. Ore is processed in a 3.5Mt/a mill with a carbon in pulp (CIP) circuit. The life of mine plan is made up of the Williams underground mine. A feasibility study was underway to confirm the viability of the Phase 6 extension of the open pit, which would have entailed a 60m layback to the north wall. However, it has been determined that this will no longer proceed and open pit operations ceased in H2 2020.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed Map

What's included

This report contains:

  • Document

    Hemlo (Williams plus David Bell) gold mine

    XLS 144.50 KB

  • Document

    Hemlo gold mine

    PDF 1.22 MB

  • Document

    Hemlo (Williams plus David Bell) gold mine

    ZIP 1005.04 KB