Asset report

Huludao (VR) zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Japanese established the Huludao Vertical Retort (VR) smelter in 1937 with a capacity of 10kt/a zinc and 15kt/a sulphuric acid. Following the establishment of the PRC in 1950 the plant was expanded to the present quoted vertical retort capacity of 210kt/a. Estimated actual capacity is slightly higher at 226kt/a slab zinc.

What's included

This report contains

  • Document

    Huludao (VR) zinc smelter

    PDF 645.31 KB

  • Document

    Huludao (VR) zinc smelter.xls

    XLS 528.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898