Asset Report
Huogeqi zinc mine
Report summary
Huogeqi mine is located in Inner Mongolia province, China. The operation consisted of two separate plants, a copper plant and a separate lead-zinc plant. Zinc and lead section was only operational from year 2008 to year 2010, of which operation has stopped ever since. Copper production is ongoing, but not included in the accompanying profile. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Andaychagua zinc mine
A detailed production, commercial and costs analysis of the Andaychagua zinc mine.
$2,250
Asset Report
Garpenberg zinc mine
A detailed analysis of the Garpenberg zinc mine.
$2,250
Asset Report
Morococha zinc mine
A detailed production, commercial and competitive cost analysis of the Morococha zinc mine.
$2,250