Hurley (closed) copper smelter
Report summary
The smelter was commissioned in 1939 with one green feed reverberatory furnace and two 4.0m x 9.1m Peirce-Smith converters, with production cast as blister sows. A third converter was added in 1941 and a reverberatory fire-refining furnace was installed in 1942. A fourth converter was installed in 1971 followed by a double contact acid plant to treat converter gases in 1974. The reverberatory furnace was replaced by an Inco flash furnace together with an associated 410t/d oxygen plant in...
Table of contents
- Environmental
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hidalgo (closed) copper smelter
A detailed analysis of the Hidalgo copper smelter.
$2,250
Asset Report
Alaska (closed) copper smelter
A detailed analysis of the Alaska copper smelter.
$2,250
Asset Report
Copper Cliff (closed) copper smelter
A detailed analysis of the Copper Cliff copper smelter.
$2,250