Asset Report

Ilo copper refinery

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The refinery is located 9km north of the port of Ilo on the southern Peru coast and has adequate road and sea links. The tankhouse was supplied to Minero-Peru on a turn-key basis by Mitsui-Furukawa and the anode plant was constructed by Minero-Peru using Maerz as consultants.  The plant was commissioned in October 1975 at a cost of US$56M with a capacity of 150kt/a cathode.  It was designed and located specifically to treat blister from the nearby Ilo smelter owned by SPCC.  The capacity was...

What's included

This report contains

  • Document

    Ilo copper refinery

    PDF 517.92 KB

  • Document

    Ilo copper refinery.xls

    XLS 694.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Products: Image 1
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898