Asset Report
Ilo copper refinery
Report summary
The refinery is located 9km north of the port of Ilo on the southern Peru coast and has adequate road and sea links. The tankhouse was supplied to Minero-Peru on a turn-key basis by Mitsui-Furukawa and the anode plant was constructed by Minero-Peru using Maerz as consultants. The plant was commissioned in October 1975 at a cost of US$56M with a capacity of 150kt/a cathode. It was designed and located specifically to treat blister from the nearby Ilo smelter owned by SPCC. The capacity was...
Table of contents
- Emissions
Tables and charts
This report includes 2 images and tables including:
- Ilo Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Chifeng Jinjian copper refinery
A detailed analysis of the Chifeng Jinjian copper refinery.
$2,250
Asset Report
Tongling (Jinguan) copper refinery
A detailed analysis of the Tongling (Jinguan) copper refinery.
$2,250
Asset Report
Hengbang copper refinery
A detailed analysis of the Hengbang copper refinery
$2,250