Jinli (Zinc) zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Jinli smelter was commissioned in September 2021 and commenced trial production in early December 2022 with a capacity of 150kt/a. The plant included one the largest 152m2 roaster, Chinese tankhouse and leach residue processed in the lead smelter on site. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes the following images and tables:

    Detailed mapFeed Preparation

What's included

This report contains:

  • Document

    Jinli (Zinc) zinc smelter

    PDF 1.19 MB