Asset Report

Jinshan zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Jinshan smelter was commissioned in 2010 with a capacity of 60kt/a. Unlike many Chinese smelters, Jinshan uses mainly low grade oxide ore, from its mine at Dachang, and purchased calcine (currently 70% of the feed) as the raw materials to make slab zinc. The flowsheet features two leaching and purification lines, a 40kt/a line used for purchased calcines and a 20kt/a for processing oxide ores. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Other

Tables and charts

This report includes 7 images and tables including:

  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Jinshan zinc smelter

    PDF 1.21 MB

  • Document

    Jinshan zinc smelter

    ZIP 1.14 MB