Asset Report
Johnson Camp SxEw copper mine
Report summary
The accompanying analysis considers the resumption of copper cathode production at the historic Johnson Camp mining area. The targeted production rate was ~25Mlb/a of copper cathode over a 16 year mine life. The restart project involved relining an existing solution pond, construction of three new lined ponds, preparation of a new stand-alone lined leach pad facility for approximately 60 percent of the new ore, and installation of a three-stage crushing circuit.
Table of contents
- Summary
-
Key issues
- CAPEX
- Mining
- Process
- Leach
- SxEw
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Gunnison SxEw copper mine project
A detailed analysis of the Gunnison SxEw copper mine project.
$2,250
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250