Asset Report

Kamioka zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Kamioka smelter in Japan uses roast, leach electrowin technology to make slab zinc. The leach residues are treated using the Goethite process with residue being stored in redundant mine workings. The current capacity is 68kt/a of slab zinc and there are no plans to increase this. The impending closure of the Century zinc mine could well impact operations at the smelter. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset

Table of contents

  • Summary
  • Key Issues
  • Emissions

Tables and charts

This report includes 8 images and tables including:

  • Kamioka Emission Intensity Quartile Ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Kamioka zinc smelter

    PDF 1.67 MB

  • Document

    Kamioka zinc smelter

    ZIP 1.21 MB