Kashima steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Final steel production (Mt)
- Production table (Mtpa)
- Finished steel cost (US$/tonne)
What's included
This report contains:
Other reports you may be interested in
Avilés aluminium smelter
A detailed analysis of the Avilés aluminium smelter.
$2,250Zhangjiagang (Tianqi) - Lithium refinery
A detailed analysis of the Zhangjiagang (Tianqi) lithium refinery.
$2,250West Taijinar (Hengxinrong) - Lithium brine
A detailed analysis of the West Taijinaier 1 lithium brine operation.
$2,250