Asset report

Kemess North copper mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Kemess North is located some 430km northwest of Prince George and is connected to the towns of Fort St James and Mackenzie by dirt road.The Kemess South open cut mine closed in March 2011 after 13 years of operation. Kemess North is an underground project located 6.5 km from the old open pit and 6.5km from the Kemess South plant site. A PEA was completed in 2011 and a Full Feasibility study was completed in 2013. In 2016 an updated Feasibility Study was released. Average annual production is estimated at 47Mlbs Cu and 106koz Au over a 12 year mine life...

What's included

This report contains

  • Document

    Kemess North copper mine project

    XLS 503.00 KB

  • Document

    Kemess North copper mine project

    PDF 640.48 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Infrastructure
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Asset report

Eagle nickel operation

Asset report

LaRonde gold mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898