Asset report

Khnaiguiyah copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Khnaiguiyah Project is located in Saudi Arabia, approximately 170km south-west of Riyadh. The deposit is proposed to be mined using open pit mining, with an estimated 13 year mine life based on ore reserves. There are three pits in the mine plan outlined in the 2013 Definitive Feasibility Study, K1, K2 and K3 that will be mined to depths of approximately 95m, 155m and 220m respectively.

What's included

This report contains

  • Document

    Khnaiguiyah copper mine project

    XLS 503.50 KB

  • Document

    Khnaiguiyah copper mine project

    PDF 973.31 KB

Table of contents

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

Asset report

Sungun copper mine

Asset report

Miduk copper mine

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898