Kimbo bauxite mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Emissions
- Snapshot
- Mining
- Process
Tables and charts
This report includes the following images and tables:
- Kimbo Emission Intensity Quartile Ranking - total global production - tonnes bauxite
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Global bauxite mine asset cost summary
The Global Bauxite Asset Summary examines the cost environment in the base year as well as historically and forward five years.
$6,750Lisso bauxite mine
Lisso began production in 2020 with the farm out arrangement in place with Alliance Guinéenne de Bauxite d'Alumine et d'Aluminium (AGB2A).
$2,250Panchpatmali/Pottangi bauxite mines
A detailed analysis of the Panchpatmali bauxite mine.
$2,250