Asset Report

Kirovgrad zinc smelter project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

03 December 2014

Kirovgrad zinc smelter project

Report summary

It was announced by Urals Mining & Metallurgical Co (UMMC) in early 2006 that it would be building a new zinc smelter in the Sverdlov region of Russia, the actual location likely to be at Kirovgrad.  The capacity was planned to be 150kt/a slab zinc and the estimated capital cost, US$325M.  Detailed design, using Outokumpu technology, would take place in 2007, with a focus on copper and precious metals by-products since the smelter was expected to take an anticipated increasing surplus of...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Kirovgrad zinc smelter project

    PDF 818.17 KB