Asset Report

Kirovgrad zinc smelter project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

It was announced by Urals Mining & Metallurgical Co (UMMC) in early 2006 that it would be building a new zinc smelter in the Sverdlov region of Russia, the actual location likely to be at Kirovgrad.  The capacity was planned to be 150kt/a slab zinc and the estimated capital cost, US$325M.  Detailed design, using Outokumpu technology, would take place in 2007, with a focus on copper and precious metals by-products since the smelter was expected to take an anticipated increasing surplus of...

What's included

This report contains

  • Document

    Kirovgrad zinc smelter project

    PDF 818.17 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800