Asset report

Coega Bay zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

This South African smelter project has been under study since 1996. In December 1998 it was announced that Mitsui Mining and Smelting which originally had a 24.5% stake in the project had pulled out and a new partner was being sought. Mitsui's withdrawal left the project requiring another partner and further delays resulted. The project here assumed the original flowsheet of the late 1990s. The original estimated cost of the project was US$600 650M for a capacity of 220kt/a but this...

What's included

This report contains

  • Document

    Coega Bay zinc smelter project

    PDF 873.31 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898