Asset report

La Arena gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

La Arena is an epithermal deposit with gold oxides and a porphyry deposit with Cu-Au sulphides. The gold oxides are exploited through one open pit and processed by leaching and Merrill Crowe plant to recover Au dore. Gold production commenced in 2011 and is expected to be exhausted by 2020. By 2022, La Arena is expected to start producing copper-gold concentrates from its sulphide ore with a 18kt/d conventional mill.

What's included

This report contains

  • Document

    La Arena gold mine

    XLS 139.00 KB

  • Document

    La Arena gold mine

    PDF 495.70 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898