Asset report

La Caridad copper refinery

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Mexicana de Cobre started construction in late 1995 of a 180kt/a cathode refinery adjacent to the existing smelter where capacity was being increased from 184kt/a anode to 300kt/a anode. The initial plan was for mechanical completion in September 1997 with commissioning in December 1997. The plan also included the possibility of a subsequent expansion to 300kt/a cathode at a later date to match the smelter capacity but in June 1997 the company announced that it would proceed with this...

What's included

This report contains

  • Document

    La Caridad copper refinery

    PDF 533.38 KB

  • Document

    La Caridad copper refinery.xls

    XLS 695.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898