Asset report

La Libertad (Orosi) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Ore processing at La Libertad mine began on 15 December 2009 with the first dore bar produced on 5 January2010. Mining is open pit utilising conventional drill, blast and haul mining methods. The processing plant has a capacity of 2.2Mt/a and comprises a carbon in pulp (CIP) circuit.

What's included

This report contains

  • Document

    La Libertad (Orosi) gold mine

    XLS 135.00 KB

  • Document

    La Libertad (Orosi) gold mine

    PDF 598.70 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898