Asset Report
Lakeshore (Tailings) (Closed) gold mine
Report summary
From 1997, production from the Lakeshore Tailings operation is included into Macassa elsewhere in this volume. Tailings from the long closed Lake Shore mine are dredged from Kirkland Lake by a suction dredge. They are pumped overland 2.5km to a 680t/d dedicated plant located at the Macassa mill (see separate entry). Eastmaque Mines have a similar dredging operation on the northern arm of the lake. Electric dredge the Lady Lac has a 0.65m cutter-head. It is capable of working in up to 15m...
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Warrego Tailings (Closed) gold mine
A detailed analysis of the Warrego Tailings (Closed) gold mine.
$2,250
Asset Report
Mount Morgan Tailings gold mine project
A detailed analysis of the Mount Morgan Tailings gold mine project.
$2,250
Asset Report
Golden Cross (Closed) gold mine
A detailed analysis of the Golden Cross (Closed) gold mine.
$2,250