Asset Report

Lanping zinc smelter

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

05 March 2019

Lanping zinc smelter

Report summary

Construction of the 100kt/a smelter was started in March 2004 with commissioning taking place in August 2005. It is called the Lanping No2 Smelter (Huangmu was known as Lanping No1). After ore-dressing, the oxide and sulphide streams are treated in separate lines. The sulphide representing 30% of input, is roasted whilst the oxide, 70% of input, is leached after crushing and ball grinding and then joins the sulphide stream for electrowinning and casting.

Table of contents

  • Summary
  • Key issues
  • Flowsheet
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 9 images and tables including:

What's included

This report contains:

  • Document

    Lanping zinc smelter.xls

    XLS 433.50 KB

  • Document

    Lanping zinc smelter

    ZIP 1.15 MB

  • Document

    Lanping zinc smelter

    ZIP 1.15 MB

Trusted by leading organisations