Asset Report

Lanping zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Construction of the 100kt/a smelter was started in March 2004 with commissioning taking place in August 2005. It is called the Lanping No2 Smelter (Huangmu was known as Lanping No1). After ore-dressing, the oxide and sulphide streams are treated in separate lines. The sulphide representing 30% of input, is roasted whilst the oxide, 70% of input, is leached after crushing and ball grinding and then joins the sulphide stream for electrowinning and casting.

What's included

This report contains

  • Document

    Lanping zinc smelter

    PDF 636.80 KB

  • Document

    Lanping zinc smelter.xls

    XLS 499.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Projects
  • Location maps
  • Participation
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898