Asset Report

Liuzhou LZPG zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Originally Liuzhou Zinc Products Group [LZPG] had four separate production complexes located in various parts of the city of Liuzhou. It is important to realise that none of the zinc smelter sites were fully integrated. In addition, there were 4 plants using a direct process for the production of zinc oxide and various other chemical plants. Only the plants producing zinc oxide are operational. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Smelting Furnace
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 2 images and tables including:

  • Detailed map
  • Flowsheet

What's included

This report contains:

  • Document

    Liuzhou LZPG zinc smelter

    PDF 1.32 MB