Asset Report
Luoyang bauxite mine
Report summary
The complex supplies the Zhengzhou refinery (located in Gongyi City in Henan Province, 98km from the mine) and the Shandong refinery (located in Zibo City 680km from the mine). Output from Jiagou is projected to decline from 500kt in 2012 to 350kt by 2017. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Bauxite Hills bauxite mine
After the completion of the Metro Mining Ltd. takeover of Gulf Alumina Ltd. in late 2016, combined reserves reached 96Mt of bauxite ore.
$2,250
Asset Report
SMB-WAP bauxite mine
The SMB-WAP project started shipments of bauxite to China in H2 2015.
$2,250
Asset Report
Paragominas bauxite mine
A detailed analysis of the Paragominas bauxite mine.
$2,250