Asset Report
Macmillan Pass (Tom & Jason) zinc mine project
Report summary
The Macmillan Pass project comprises the Tom and Jason SEDEX deposits. Mining is anticipated to be carried out using a combination of mining methods. The operation will start with conventional open pit mining as underground development progresses. Approximately 65% of the production will be through Vertical Crater Retreat and Sub Level Retreat underground methods. Ore from both deposits will be processed at the same 5ktpd facility. The processing facility will consist of two crushing circuits, primary grinding, a lead flotation circuit and a zinc flotation circuit. Both the lead and zinc concentrates will have payable silver.
Table of contents
- Summary
- Key Issues
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
West Whundo zinc mine project
A detailed analysis of the West Whundo zinc mine project.
$2,250
Asset Report
Kihabe-Nxuu zinc mine project
A detailed analysis of the Kihabe-Nxuu zinc mine project.
$2,250
Asset Report
Hermosa zinc mine project
A detailed analysis of the Hermosa zinc mine project.
$2,250