Malomir is an open pit and underground operation utilising conventional mining methods. The deposit contains predominantly reserves of refractory ore. The mill has initially treated non-refractory ore from the Quarzitovoye pit using resin-in pulp (RIP) methods but is currently transitioning towards mainly refractory ore processing using the onsite flotation plant. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.