Asset report

Mawu (Huize) zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Due to its age and location the Zhehai (Huize) smelter was closed in 2011 and its production was replaced by this new 100kt/a zinc (operationally 133kt/a) 60kt/a lead smelter situated at Mawu (near Huize). Mawu was planned to start production during 2012 however commissioning actually began in late 2013.

What's included

This report contains

  • Document

    Mawu (Huize) zinc smelter

    PDF 653.79 KB

  • Document

    Mawu (Huize) zinc smelter.xls

    XLS 491.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898