Asset Report

Mengzi zinc smelter

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

05 March 2019

Mengzi zinc smelter

Report summary

Mengzi zinc smelter was commissioned in 2006 with capacity of 65kt/a zinc and 50t Indium. The smelter employs the traditional Chinese electrolytic process flowsheet with a 75m2 grate area fluid bed roaster and leach residues treated by a Waelz kiln In 2014, process debottlenecking raised capacity to 70kt/a and during Q2 2016, capacity was again raised to 100kt/a slab zinc. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Flowsheet
    • Feed preparation
    • Roaster & Acid plant
    • Leaching & Purification
    • Tankhouse, melting & Casting

Tables and charts

This report includes 13 images and tables including:

What's included

This report contains:

  • Document

    Mengzi zinc smelter.xls

    XLS 437.00 KB

  • Document

    Mengzi zinc smelter

    ZIP 1.17 MB

  • Document

    Mengzi zinc smelter

    ZIP 1.17 MB

Trusted by leading organisations