Asset Report

Portovesme zinc smelter

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

04 March 2020

Portovesme zinc smelter

Report summary

The Portovesme electrolytic zinc smelter has a nameplate capacity of 140kt slab zinc per annum and is part of an integrated complex which includes a Kivcet lead smelter and a Waelz kiln fuming plant. The local San Gavino (70km from Portovesme) lead refinery now forms part of the combined enterprise. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues

Tables and charts

This report includes 7 images and tables including:

  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Portovesme zinc smelter

    ZIP 7.18 MB

  • Document

    Portovesme zinc smelter

    ZIP 1.15 MB

  • Document

    PvelZn_Porto Vesme (EL).xlsm

    XLSM 7.47 MB

Trusted by leading organisations