Report summary
Merian is the largest greenfield gold project commissioned since the end of the gold bull run in late-2012. The operations comprise three orogenic gold deposits. Merian is mined using conventional truck and shovel mining methods at a series of open pits with ore processed in a 12Mt/a carbon in leach (CIL) circuit. The gold dore produced at the mine is shipped to Argor-Heraeus in Switzerland for refining. Commercial production commenced in October 2016. Based on end of 2020 reserves, the mine is expected to operate until 2035.
Table of contents
- Summary
- Key Issues
- CAPEX
- Power
- Mining
- Process
- Royalties & Taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: