Morro Agudo zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Summary and key issues
- Summary
- Key issues
- Emissions
- Power
- Water
- Mining
- Processing
- Royalties
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Morro Agudo Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Guelb el Rhein iron ore mine
Due to a high strip ratio and low raw ore grade, Guelb el Rhein has one of the highest mining costs in our dataset.
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250Antamina zinc mine
A detailed production and cost competitive analysis of the Antamina zinc mine.
$2,250