Asset Report
Mount Isa copper smelter
Report summary
The Mount Isa copper smelter was commissioned in 1953 to treat the concentrate from the Mount Isa mine. A new smelter with a capacity of 100kt/a blister was commissioned on the same site in 1962. In 1973 a fluid bed roaster replaced the multiple hearth roasters, increasing capacity to 150kt/a blister. In 1979, anode casting facilities were added to produce anodes for refining at Townsville and a rise in concentrate grade increased smelter capacity to 165kt/a anode by 1985. In October 1990...
Table of contents
- Emissions
- Environmental
Tables and charts
This report includes 6 images and tables including:
- Mount Isa Emission Intensity Quartile ranking - total global production - tonnes Cu
- Detailed map
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mount Isa copper mine
A detailed analysis of the Mount Isa copper mine.
$2,250
Asset Report
Townsville copper refinery
A detailed analysis of the Townsville copper refinery.
$2,250
Asset Report
Mount Isa Pb_Zn section zinc mine
A detailed analysis of the Mount Isa Pb_Zn section zinc mine.
$2,250