Asset Report

Naoshima copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

All fields are required

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Naoshima Smelter was built in 1917 to treat domestic copper concentrates using a green fed reverberatory furnace with a capacity of 3.6kt/a copper.  In 1939 capacity was increased to 12kt/a and an acid plant to treat converter offgas was installed.  Capacity was further increased to 36kt/a anode in 1957 and a 220t/d Lurgi acid plant was added in 1958.  By 1968 smelter capacity had been increased to 72kt/a copper and in 1969 a calcine fed reverberatory furnace, a 720t/d Lurgi acid plant...

What's included

This report contains

  • Document

    Naoshima copper smelter

    PDF 619.20 KB

  • Document

    Naoshima copper smelter.xls

    XLS 484.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898