Asset Report
Niquel Tocantins - Closed nickel operation
Report summary
Mining and the laterite roast-leach and carbonate production operations commenced in 1981 at Niquelândia. The initial nickel production capacity of the plant was 5k t/a, and cobalt was produced as a mixed hydroxide product from a nickelic precipitation process. As the production capacity of the plant was increased, SxEw was introduced to the flowsheet. In 1992 the nickel production capacity was raised to 10k t/a and in 1997 a capital expansion of $134.4M was approved to increase the capacity. The operation was placed on care and maintenance in 2016 due to continued operating losses.
Table of contents
- Mining
-
Process
- Refining
Tables and charts
This report includes 4 images and tables including:
- Cashflow
What's included
This report contains:
Other reports you may be interested in
Asset Report
Cawse - Closed nickel operation
A detailed analysis of the Cawse - Closed nickel operation.
$2,250
Asset Report
Bucko Lake - Closed nickel operation
A detailed analysis of the Bucko Lake - Closed nickel operation.
$2,250
Asset Report
Long - Closed nickel operation
A detailed analysis of the Long nickel operation.
$2,250