Asset report

Noyelles-Godault zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Lead production commenced at Noyelles Godault in 1898 and there is currently a 150kt/a lead smelter together with an associated lead refinery on site. An Imperial Smelting Furnace with an upper shaft area of 17.2m2 was commissioned in 1962. The design capacity was 35kt/a zinc.

What's included

This report contains

  • Document

    NogoZn.xls

    XLS 257.50 KB

  • Document

    Noyelles-Godault zinc smelter

    PDF 725.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898