Asset Report

Overpelt zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Overpelt smelter in Belgium was closed in 1992 having been a zinc production facility since 1934. Although not actively smelting zinc today, the Overpelt site is highly integrated with Nyrstar’s European smelters and acts as their centralised melting and casting facility. A proportion of cathode produced at Auby all of Balen's cathodes are transported to Overpelt for melting and casting. The facility today has a capacity to produce 200kt/a Zamak alloy and 200kt/a SHG Zinc.

What's included

This report contains

  • Document

    Overpelt (Electrolytic) closed zinc smelter

    XLS 150.50 KB

  • Document

    Overpelt zinc smelter

    PDF 702.19 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Residue Disposal
    • Other
  • Products
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Asset Report

Balen zinc smelter

Asset Report

Auby zinc smelter

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898