Asset report

Oyu Tolgoi copper mine

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The proposed Oyu Tolgoi project comprises the Heruga Hugo South and Hugo North Lifts 1 & 2 block cave underground mines plus the Southern Oyu open pits that will all feed a conventional concentrator.An updated Technical Report was published in October 2014. The reserve case on which the accompanying analysis is based provided for a 41 year mine life (based only on proven and probable reserves) through exploitation of Southern Oyu pits 1 9 and the underground mine Hugo North Lift 1 with a 100kt/d nameplate concentrator...

What's included

This report contains

  • Document

    Oyu Tolgoi copper mine

    PDF 576.55 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
    • Operating costs
    • CAPEX
  • Production
    • Mining
    • Process
  • Sales contracts
  • Fiscal and regulatory
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

Images

  • Detailed map
  • Oyu Tolgoi Development Options

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Operations: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898