Asset report

Oyu Tolgoi copper mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The proposed Oyu Tolgoi project comprises the Heruga Hugo South and Hugo North Lifts 1 & 2 block cave underground mines plus the Southern Oyu open pits that will all feed a conventional concentrator.An updated Technical Report was published in October 2014. The reserve case on which the accompanying analysis is based provided for a 41 year mine life (based only on proven and probable reserves) through exploitation of Southern Oyu pits 1 9 and the underground mine Hugo North Lift 1 with a 100kt/d nameplate concentrator...

What's included

This report contains

  • Document

    Oyu Tolgoi copper mine

    PDF 576.55 KB

  • Document

    Oyu Tolgoi copper mine.xls

    XLS 621.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Sales contracts
  • Fiscal and regulatory
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 10 images and tables including:

Images

  • Detailed map
  • Oyu Tolgoi Development Options

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Operations: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898