Asset Report
Pallas Green zinc mine project
Report summary
The Pallas Green Project is located between Limerick and Tipperary in Ireland. The Project focuses on the exploration of the Pallas Green Alteration Trend which is considered to be analogous to the Lisheen Alteration trend. Access to the area is good with extensive minor road infrastructure. Prospecting licenses held by the project covers an area of approximately 294km2. Glencore estimated inferred mineral resources to be 45.4Mt at a grade of 7% Zn and 1% Pb, as of 31 December 2020.
Table of contents
- Summary
- Key Issues
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Prairie Creek zinc mine project
A detailed analysis of the Prairie Creek zinc mine project.
$2,250
Asset Report
Ozernoye zinc mine project
A detailed analysis of the Ozernoye zinc mine project.
$2,250
Asset Report
Izok Lake zinc mine project
A detailed analysis of the Izok Lake zinc mine project.
$2,250