Asset Report
Pan gold mine project
Report summary
The Pan project, located in Nevada, was planned as a conventional open pit operation from multiple pits (South, North and satellite pits) with heap leach ore processing at a rate of 6.5Mt/a over a 3.5-year mine life, producing a total of 233koz over the life of mine. However, full capacity has not been achieved since operations commenced in 2015. The existing mine plan is for a further 5 years of production, based on an annual throughput of 14ktpd. Fiore are currently assessing the viability of an expansion to 17ktpd.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- Power
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Tocantinzinho gold mine project
A detailed analysis of the Tocantinzinho gold mine project.
$2,250