Asset report

Pan gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Pan project is a conventional open pit operation from multiple pits (South North and satellite pits) with heap leach ore processing at a rate of 6.5Mt/a. Production commenced in 2015 and is expected to continue up to 2019. Average life of mine gold production is 47koz. There is potential to extend the mine life through the development of the Gold Rock Project (located 8km south east of the Pan property).

What's included

This report contains

  • Document

    Pan gold mine project

    XLS 124.50 KB

  • Document

    Pan gold mine project

    PDF 554.56 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898