Asset Report

Pan gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Pan project, located in Nevada, was planned as a conventional open pit operation from multiple pits (South, North and satellite pits) with heap leach ore processing at a rate of 6.5Mt/a over a 3.5-year mine life, producing a total of 233koz over the life of mine. However, full capacity has not been achieved since operations commenced in 2015. The existing mine plan is for a further 5 years of production, based on an annual throughput of 14ktpd. Fiore are currently assessing the viability of an expansion to 17ktpd.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Pan gold mine project

    XLS 123.00 KB

  • Document

    Pan gold mine project

    PDF 1.26 MB

  • Document

    Pan gold mine project

    ZIP 953.04 KB