Asset Report

Perama gold mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

11 September 2017

Perama gold mine project

Report summary

Perama will be an open pit operation ustilising conventional mining methods. Processing will comprise a three stage crushing circuit and ball mill operating in a closed circuit with hydrocyclones together with a conventional 1.25Mt/a CIL mill. The project was placed on care and maintenance in January 2016.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Geology
    • Mining
    • The accompanying analysis assumes conventional open pit mining, carried out by the mine owners. The final pit size is expected to be 750m long and 150-400m wide with a strip ratio of 0.4:1 over a mine life of 9 years.
    • Processing
    • CAPEX
  • Timeline

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Detailed map

What's included

This report contains:

  • Document

    Perama gold mine project

    XLS 124.50 KB

  • Document

    Perama gold mine project

    PDF 978.00 KB